Hi Lakshmipathi,
thanks for the support..
am trying with two as it is only for testing, the number orders for V_RA will be more in the actual scenario.. as you said, i tried to change the confirmed quantity individually in VA02 then i run V_V2 but the same result..V_V2 overwrite the manually allocated quty..below is the ATP window after and before manual allocation..Is there any option to control V_V2 from rescheduling the manually allocated qty?